Installing high-voltage through-wall conduits demands strict adherence to safety and electrical codes. Follow these critical steps to avoid risks like fires, equipment damage, or code violations:
1. Pre-Installation Must-Do’s
- Wall Assessment:
- Use UL-listed rigid metal conduits (RMC) for concrete/masonry walls.
- Choose liquid-tight flexible conduits (LFMC) for vibration-prone areas.
- Voltage Match: Ensure conduit ratings exceed system voltage (e.g., 35kV conduits for 33kV systems).
- Environmental Prep:
- Seal gaps with fire-rated duct sealant in damp zones.
- Allow thermal expansion with stainless steel expansion couplings.
2. Code Compliance Essentials
- NEC Article 300.4: Maintain 3-inch clearance from gas/water pipes.
- Grounding: Bond metal conduits to the building’s ground using AWG 6 copper wire.
- Hole Sizing: Drill holes 10% larger than conduit OD to prevent structural stress.
3. Avoid Costly Mistakes
- Poor Sealing: Leads to moisture ingress → Use IP68-rated epoxy for waterproofing.
- Over-Bending Cables: Follow NEC bend radius rules (e.g., 6x conduit diameter).
- Skipping Insulation Tests: Post-installation, use a Megger to confirm >100MΩ resistance.
4. Safety Gear & Post-Install Checks
- PPE: Insulated gloves, arc-flash suits, and goggles.
- Post-Install Tests:
- Verify grounding continuity (<1 ohm resistance).
- Inspect for sharp edges or burrs.
Oil&Gas exploited
Automotive Manufacturing
Transportation & Dlistrlbutlon
Manufacture
Industrial Construction
Green Energy
Copyright ? 2024 All Rights Reserved
Back to top
Comment
(0)